In November, Ward Village, the Howard Hughes Corp.’s 60-acre master-planned community, celebrated the topping off of Kōʻula, the neighborhood’s sixth residential building, with a check presentation to Honolulu CC Interim Chancellor Karen C. Lee, Ron TaketaĪ construction-related scholarship at Honolulu Community College has been seeded with a $35,000 gift to the University of Hawaiʻi Foundation. to Papa S t.(from left) Doug Johnston, Gerry Majkut, Karen C. to Papa St.: Roadway Opened 8/2/23 - Project Completed, Punchlist to South Wakea Ave)Ĭonstruction Update: Work Completed Week of 07/30/23 - 08/05/23: other incidental items.Ĭontract Working Days: 166 (199 Days Added to Contract)Įstimated Completed Date: August 11, 2023 ![]() The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts. The scope of work consists of pavement reconstruction within the road right-of-way.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |